Skip to content
AxleGuard
Demo

Move weight before moving freight

Axle Weight Shift & Tandem Slider Calculator

Turn an axle overload into an instruction a driver or loader can use. Enter the weight that must move, the transfer measured for the combination, and available slider travel; the calculator rounds up to a usable whole-hole move and flags when the rail is too short.

Planning instrument
Time
Takes about 1 minute
Privacy
Runs in your browser
Output
Slider move
Start with your numbers

Your inputs

Enter the load details

Nothing is saved

Planning result

Move the tandems 5 holes forward

A 30 in move transfers about 1,250 lb.

Slider move5 holes
Estimated transfer
1,250 lb
Extra margin
110 lb
Travel available
12 holes

What this means

  • 1,140 lb ÷ 250 lb per hole = 4.56 holes.
  • A slider can only stop on a whole hole, so the result rounds up.

Assumptions

  • The entered transfer-per-hole value is correct for this tractor, trailer and load.
  • The opposite axle group has enough legal and equipment capacity to receive the transferred weight.

Worked example

See the calculation in plain English.

A drive tandem 1,140 lb over with about 250 lb transferred per hole needs five holes forward: roughly 1,250 lb transferred over 30 inches.

What this tool does not decide

  • Transfer per hole varies with wheelbase, kingpin setting, tandem geometry and load position.
  • The receiving axle group must have legal and equipment headroom.

Common questions

Use the result without guessing.

Which way do I slide trailer tandems to remove weight from the drives?

Moving the trailer tandems forward generally transfers weight from the tractor drives to the trailer axle group. Confirm the direction and measured effect on your actual combination.

Is every tandem hole worth 250 lb?

No. That is a common rule of thumb, not a constant. Wheelbase, slider spacing, freight position and combination geometry change the result.