Keep one answer through the whole run
A load should not be rebuilt as paperwork, a route, a scale reading and a telemetry event in four different systems. The equipment, freight, rules and verdict stay connected from planning through arrival.
About
AxleGuard started with the late axle answer. It became a wider freight operating platform because preventing that failure requires the load, equipment, rules, route and live run to stay connected.
Where it started
A bill of lading holds one number for weight. A scale house reads five. The shipper, broker, dispatcher and driver all make their decision from that one number. Enforcement is done on the five.
That gap does not close with more care. It closes with arithmetic that nobody has time to do by hand. Every consecutive axle group faces four competing limits. A second jurisdiction and four hundred miles of fuel burn can move the answer while the truck is running.
So the tool had to do three unglamorous things at once. Solve the physics from where the freight actually sits. Say what to move, not just that something is wrong. And keep saying it as the load changes on the road.
Plenty of things can tell you what a load weighs. Very little will tell you what to do about where it sits, which is the part that costs money on a Tuesday.
Not a setting on the account. A truck crosses a state line in the middle of a run, and a system that holds one global rule set has already decided to be wrong on half the freight.
An over-limit load cannot be dispatched, and there is no override. A warning that can be dismissed is a warning that is dismissed at the end of a bad shift.
Every change is written down with what it looked like before. A compliance position you cannot reconstruct two years later is not really a compliance position.
Nothing here is self-serve. An axle limit is a legal position, and nobody should be configuring one from a card form at two in the morning without hearing what this is and is not.
The gap, counted
This is the whole reason the product exists, expressed as arithmetic rather than as an argument.
The gross weight, which is the one number that does not move when the load is built badly
Gross, the drive tandem and the trailer tandem
Five single axles, ten consecutive axle groups, and the gross
A five-axle tractor-semitrailer has five single axles, ten consecutive groups of two or more that the bridge formula applies to, and one gross limit. That is sixteen separate ways to be over, and exactly one of them is written on the paperwork everybody in the chain reads. Counted, not estimated.
A bill of lading holds one number for weight. A scale house reads five, and the arithmetic behind them runs to sixteen.
How we work
They are worth stating because they are the ones most easily abandoned when a page needs to be more persuasive than the product is ready to support.
A load should not be rebuilt as paperwork, a route, a scale reading and a telemetry event in four different systems. The equipment, freight, rules and verdict stay connected from planning through arrival.
Telling somebody a load is illegal leaves them exactly where they were, only more worried. Every failing verdict here comes with the move that fixes it, in the units the yard already uses.
Equipment, jurisdictions and integrations are named in the rollout scope. If a combination needs custom modelling, that is settled before configuration starts.
Not for a buyer, not for a conference. If a sentence on this site would not survive being read out to a dispatcher at six in the morning, it does not belong here.
Who built it
The same people wrote the arithmetic, built the screens and run the demonstration calls. That is the only structural fact about us that should matter to you on a call.
What you will not find here
Straight answers
No customer logos, no testimonials, and no statistics we did not measure. We have not earned any of them yet.
Read next
Next step
Bring the hardest question on your current process. You will get a direct answer from the team responsible for the solver, the rules and the rollout.